If the Antalya-Alanya Motorway is completed, the trip will drop to 36 minutes
Minister of Transport and Infrastructure Abdulkadir Uraloğlu announced that once the ongoing Antalya-Alanya Motorway is finished, the 2,5-hour trip on the current route will be reduced to 36 minutes. The physical progress of the project was stated as 35 percent. The minister said the aim is to save a total of 23,9 billion lira per year and to ease traffic congestion during the tourism season.
This summary was generated by AI; the official source prevails.
What does it mean?
The road between Antalya and Alanya currently takes a long time. Once the motorway is finished, the trip will take about 36 minutes, but the project is only at 35 percent so far.
Who is affected?
Drivers, travelers and tourists making trips between Antalya and Alanya.
What changes?
Currently the trip on the existing route takes 2,5 hours; once the motorway is finished, this time is planned to drop to 36 minutes.